Pre / Post Planning

Civil Engineering – Pre/Post Planning

We’re here to help!

Our comprehensive pre and post planning services are outlined below.  Please contact us to discuss your requirements in more detail.

Download Pre/Post Planning PDF

PRE-PLANNING

  • Full Engineering Site Appraisal.
  • Due Diligence/Viability Engineering Appraisal incl. Budget Costings.
  • Engineering Guidance Associated with Proposed Masterplan Layouts Including:-
    • Site Access Points incl. Visibility Requirements
    • Format of Access Junction Requirements
    • Onsite Highway Layouts
    • Onsite Existing and Proposed Utility Requirements incl. Easement, Wayleaves, Substations, Pumping Stations etc.
    • Proposed Building Layouts to overcome topography and environmental impacts
    • Size, Location and Format of SUDS Features
  • Flood Risk Assessment.
  • Drainage Assessments.
    • Preliminary Surface and Foul Water Drainage Design including SUDS and Attenuation Requirements (Outline Planning Application)
    • Detailed Surface Water Drainage Design incl. SUDS, Attenuation Requirements and Hydraulic Modelling Calculations (Detailed Planning Application)
  • Existing Topographical Survey.
  • Existing and Proposed Utility Assessment including Utility Ground Scans.
  • Swept Path Analysis using Autotrack.
  • Engineering support at Public Enquiries.
  • Pre-Construction Highway Dilapidation Survey.
  • Party Wall Appraisal.

POST-PLANNING

  • S278/S38 Adoptable Road Design to Meet Highway Authority Requirements.
  • Detailed Roundabout Design.
  • Detailed Junction Design.
  • Traffic Calming Scheme Design.
  • Designer Responses to Road Safety Audits.
  • Swept Path Analysis using Autotrack.
  • Section 116 Highways Stopping Up/Diversion Design and Applications.
  • Post Construction Highway Dilapidation Surveys.
  • S104 Adoptable Surface and Foul Water Drainage Design to Meet Water Authority Requirements.
  • S102 Adoption of Existing Sewer Applications to Meet Water Authority Requirements.
  • S106 Sewer Connection Design and Applications to Meet Water Authority Requirements.
  • S185 Sewer Diversion Design and Applications to Meet Water Authority Requirements.
  • Detailed SUDS Design.
  • Proposed Levels Design.
  • Private Hard-standing Pavement Design.
  • Private Surface and Foul Water Drainage Design.
  • Cut and Fill Earthworks Design.
  • Foundation Schedules.
  • Civil Engineering Technical Support to Construction Teams incl. Site Visits/Inspections.
  • Party Wall Services.

Our Services